Skip to main content

Network Updates

Service Disruption: Newdegate Street West Hobart from 9 April to 31 July 2019

Regions

Hobart

Routes impacted

203 239 260 540

Dates

From to


Road resurfacing works in Newdegate St between Mellifont St and Lochner St, will require the temporary closure of two stops and buses to divert.  Works are scheduled to continue until 31 July 2019.


Service Deviations

Journeys to Hobart

  • From Arthur St, continue Arthur St, then right to Elaine Cres (after Mellifont St), then right Rosendell Ave, then right to Mellifont St terminus, then route as normal.

Bus Stop Alterations

The following bus stops will be closed

  • Bus Stop Newdegate St past Lochner St

Alternative Bus Stops

  • Bus Stop 20 Mellifont St

Journeys from Hobart

  • From Hill St left into Arthur St, right into Elaine Cres (after Mellifont St), then right into Rosendell Ave, then right to Mellifont St terminus, then left at Arthur St and continue to Elizabeth St and route as normal

Bus Stop Alterations

The following bus stops will be closed

  • Bus Stop Newdegate St before Lochner St

Alternative Bus Stops

  • Bus Stop in Arthur St past Lochner St (outside 51 Arthur St)

Route 203  and 260 Diversion

From Hill St, right into Hamilton St, left into Lochner, then left into Arthur St, right into Elaine Cres (after Mellifont St), then right into Rosendell Ave, then right to Mellifont St terminus, then left at Arthur St and continue to Elizabeth St and route as normal